Baileigh RWP-110 Pipe Welding Positioner

$6,927.50Current price is: $6,927.50.

  • 11 ton capacity
  • 220V, 3PH
  • Perfect for welding, polishing, glue-lining and assembling
  • Self aligning
SKU: BA9-1017700 Categories: , ,
Description

Baileigh RWP-110 Pipe Welding Positioner is a Baileigh Industrial product in the Welding Equipment collection.

Product Details

  • 11 ton capacity
  • 220V, 3PH
  • Perfect for welding, polishing, glue-lining and assembling
  • Self aligning
  • Description
  • Perfect for any type of tank fabrication, the RWP-110 offers 11 tons of tank turning power. These tank rollers will make short work of even the most tedious jobs.
  • 11 ton capacity (RWP-110)
  • Dual drive wheels Dual idler wheels
  • AC inverter drivenu Self-aligning
  • Conventional style with rubber drive wheels
  • 220V 3-phase
  • Maximum Load Capacity: 19,800Ibs
  • Minimum Diameter: 121/2"
  • Maximum Diameter: 110"
  • Rotation Speed: 19-196 feet per hour
  • Total Rollers: 4
  • Driven Rollers: 2
  • Rubber Roller Diameter: 11.8"
  • Rubber Roller Width: 4.72"
  • Steel Roller Diameter: 11.4"
  • Steel Roller Width: 1"
  • Speed Control: AC Inverter
  • Motor KW: .55
  • Shipping Weight: 1,606Ibs
  • Shipping Dimensions: 77" x 32" x 78"

Specifications

  • Manufacturer: Baileigh Industrial
  • SKU: BA9-1017700
  • UPC: 19907697947
  • Shipping Method: LTL Freight
  • Weight: 1,500 lb
  • Dimensions: 77 × 32 × 78 in
  • Country of Origin: China
Additional information
Weight1500.0 lbs
Dimensions77.0 × 32.0 × 78.0 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Baileigh RWP-110 Pipe Welding Positioner”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.