Baileigh RWP-440 Welding Positioner Tank Roll
$20,203.82Current price is: $20,203.82.
- 44 Ton Capacity
- Perfect for welding, polishing, glue-lining, and assembling
- 220V, 3PH
- Self-aligning
Baileigh RWP-440 Welding Positioner Tank Roll is a Baileigh Industrial product in the Welding Equipment collection.
Product Details
- 44 Ton Capacity
- Perfect for welding, polishing, glue-lining, and assembling
- 220V, 3PH
- Self-aligning
- Description
- This 44 ton turning roll is perfect for welding those tough round objects that require precise weld placement.
- Dual drive wheel
- Dual idler wheels
- AC inverter driven
- Conventional style with rubber drive wheels
- 220V 3-phase
- Maximum Load Capacity: 79,200Ibs
- Minimum Diameter: 23.6"
- Maximum Diameter: 165.3"
- Rotation Speed: 19-196 Feet per hour
- Total Rollers: 4
- Driven Rollers: 2
- Rubber Roller Diameter: 15.7"
- Rubber Roller Width: 4.7"
- Steel Roller Width: 1.57"
- Speed Control: AC Inverter
- Motor KW: 1.5
- Shipping Weight: 5,500Ibs
- Shipping Dimensions: 122" x 41" x 63"
Specifications
- Manufacturer: Baileigh Industrial
- SKU: BA9-1017702
- UPC: 19907697954
- Shipping Method: LTL Freight
- Weight: 2,200 lb
- Dimensions: 122 × 41 × 63 in
- Country of Origin: China
| Weight | 2200.0 lbs |
|---|---|
| Dimensions | 122.0 × 41.0 × 63.0 in |
| Brand | Baileigh Industrial |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.