Jet JTM-2 Mill With 3-Axis ACU-RITE 203 DRO (Knee) With X-Axis Powerfeed 690095
$14,933.27Current price is: $14,933.27.
- Certified Meehanite® castings
- Large Diameter quill is chromed
- Precision bored and honed milling head
Jet JTM-2 Mill With 3-Axis ACU-RITE 203 DRO (Knee) With X-Axis Powerfeed 690095 is a JET product in the Milling Machines collection.
Product Details
- Certified Meehanite® castings
- Large Diameter quill is chromed
- Precision bored and honed milling head
- Three-stage power down feed with auto stop, high precision Class 7 spindle bearings and the rugged stability of Meehanite® castings ensures you get everything you need from the JTM-1 and 2 models. The internally cooled spindle head prevents seizing, and JET precision engineering ensures superior results with all the features you've come to expect, all backed by the industry-leading JET Two Year Warranty
- Specification: Value
- Style (Type): Variable Speed R8
- Spindle Taper (In. x TPI): R-8
- Weight: 2200.0000
- Width: 0.0000
- Height: 0.0000
- Length: 0.0000
Specifications
- Manufacturer: JET
- SKU: JT9-690095
- UPC: 731325473995
- Shipping Method: LTL Freight
- Weight: 2,200 lb
- Dimensions: 1 × 1 × 1 in
- Country of Origin: Taiwan
| Weight | 2200.0 lbs |
|---|---|
| Dimensions | 1.0 × 1.0 × 1.0 in |
| Brand | JET |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.