ME 28T Single Sided Edgebander
ME 28T Single Sided Edgebander $12,885.00Current price is: $12,885.00.
Back to products
MX340 High Frequency Automatic Edgebander, 3 Phase
MX340 High Frequency Automatic Edgebander, 3 Phase $15,420.00Current price is: $15,420.00.

MX350M Automatic Edgebander with Premilling, 3 Phase

$15,480.00Current price is: $15,480.00.

  • 23 FPMFlow Rating
  • 47-1/4"Height
  • 126"Length
  • Automatic EdgebanderProduct Type

7 in stock

SKU: CANMX350M-3PH Category: Tags: ,
Description

Overview

MX350M Automatic Edgebander with Premilling, 3 Phase is documented as a Automatic Edgebander from Cantek America. The exact CANMX350M-230-3 configuration is mapped to GT Machinery Solutions SKU CANMX350M-3PH. Recorded technical data includes speed: 10500 RPM, width: 47-1/4", and height: 47-1/4". Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.

Technical Specifications

Flow Rating 23 FPM
Height 47-1/4"
Length 126"
Product Type Automatic Edgebander
Speed 10500 RPM
Weight 1,400.000 lbs
Width 47-1/4"
Additional information
Weight1400 lbs
Dimensions126 × 47.252 × 47.252 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “MX350M Automatic Edgebander with Premilling, 3 Phase”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.