Baileigh Industrial 220V Single Phase Pipe & Tube Notcher TN-200E BA9-1008007

$5,165.15Current price is: $5,165.15.

  • Notching Capacity Pipe: 1/4", 3/8", 1/2", 3/4", 1", 1-1/4", 1-1/2",2"
  • Power: 220V / 1-phase
  • Designed to notch schedule 40 pipe ranging from 0.25” to 2” in size
  • Makes perfect 90° notches in seconds
SKU: BA9-1008007 Categories: , ,
Description

Baileigh Industrial 220V Single Phase Pipe & Tube Notcher TN-200E BA9-1008007 is a Baileigh Industrial product in the Notchers collection.

Product Details

  • Notching Capacity Pipe: 1/4", 3/8", 1/2", 3/4", 1", 1-1/4", 1-1/2",2"
  • Power: 220V / 1-phase
  • Designed to notch schedule 40 pipe ranging from 0.25” to 2” in size
  • Makes perfect 90° notches in seconds
  • Description
  • Do you make 90° notches in schedule 40 pipe all day, every day? The TN-200E electric tubing notcher is just what you need to create fast and clean notches without any fuss.
  • Features
  • This tubing notcher runs on 220-volt single-phase power.
  • Easy to operate: Just insert the end of the pipe you need to cope. The TN-200E electric pipe notcher will notch one side. Rotate pipe 180° and reinsert to notch the other side.
  • Just insert the end of the pipe you need to cope.
  • The TN-200E electric pipe notcher will notch one side.
  • Rotate pipe 180° and reinsert to notch the other side.
  • Baileigh backs this tube notcher with a 1-year parts warranty and unlimited phone support from their team of seasoned customer service reps.
  • Specifications
  • Item Number: TN-200E
  • Shipping Weight: 245 lbs.
  • Shipping Dimensions: 33” x 18” x 20”

Specifications

  • Manufacturer: Baileigh Industrial
  • SKU: BA9-1008007
  • UPC: 731325418620
  • Shipping Method: LTL Freight
  • Weight: 245 lb
  • Dimensions: 33 × 18 × 20 in
  • Country of Origin: China
  • Warranty: 1 Year (Parts)
Additional information
Weight245.0 lbs
Dimensions33.0 × 18.0 × 20.0 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Baileigh Industrial 220V Single Phase Pipe & Tube Notcher TN-200E BA9-1008007”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.