Birmingham 6′ x 12 Ga Hydraulic Box & Pan Brake VH-612-6

$10,897.50Current price is: $10,897.50.

  • Bending Length: 72"
  • Mild Steel: 12 GA
  • Stainless Steel: 16 GA
  • Bending Angle: 0-135 Degrees
Description

Birmingham 6′ x 12 Ga Hydraulic Box & Pan Brake VH-612-6 is a Birmingham Machine Tools product in the Sheet Metal Brakes collection.

Product Details

  • Bending Length: 72"
  • Mild Steel: 12 GA
  • Stainless Steel: 16 GA
  • Bending Angle: 0-135 Degrees
  • Description
  • Hydraulic 6' x 12 Ga. Box & Pan Brake
  • Standard Equipment
  • 24" Manual back gauge with slide and lock for all hydraulic box and pan brakes
  • Specifications
  • Beam Adjustment: 1"
  • Min Reverse Bend: 1/2"
  • Motor: 2hp
  • Packing Size: 106" x 46" x 66"H
  • Net Weight: 4,600 lbs.
  • Standard Finger Assortment, Width & Number of Fingers
  • 3" – 6
  • 2" – 3
  • 5" – 6
  • 6" – 2
  • Total – 17
  • Optional Equipment (call for pricing):
  • 32" Single Axis, NC Programmable Power Brake Gauge with Germany ELGO#P8511

Specifications

  • Manufacturer: Birmingham Machine Tools
  • SKU: VH-612-6
  • Shipping Method: LTL Freight
  • Weight: 4,600 lb
  • Country of Origin: Taiwan
Additional information
Weight4600.0 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Birmingham 6′ x 12 Ga Hydraulic Box & Pan Brake VH-612-6”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.