Cantek SR1100 Three Head 43″ x 75″ Planer Sander 3PH 25HP/25HP/20HP
$50,570.00Current price is: $50,570.00.
- 43" x 75"Belt Size
- 3PHDrive Motor
- 8063 CFMDust Collection Minimum CFM Required (CFM)
- 11 @ 5"Dust Port Outside Diameter (In.)
8 in stock
Overview
Cantek SR1100 Three Head 43" x 75" Planer Sander 3PH 25HP/25HP/20HP is documented as a Planer Sander from Cantek America. The exact CANSR1100NDA-3 configuration is mapped to GT Machinery Solutions SKU CANSR1100NDA-3. Recorded technical data includes horsepower: 25HP/25HP/20HP, feed motor power (hp): 3HP, and motor power (hp): 25HP/25HP/20HP. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.
Technical Specifications
| Belt Size | 43" x 75" |
|---|---|
| Drive Motor | 3PH |
| Dust Collection Minimum CFM Required (CFM) | 8063 CFM |
| Dust Port Outside Diameter (In.) | 11 @ 5" |
| Feed Motor Power (HP) | 3HP |
| Feed Rate (FPM) | 13 to 59 FPM |
| Horsepower | 25HP/25HP/20HP |
| Motor Phase | 3 |
| Motor Power (HP) | 25HP/25HP/20HP |
| Motor Voltage (V.) | 230 |
| Phase | 3 |
| Product Type | Planer Sander |
| Sanding Belt Size (In.) | 43" x 75" |
| Voltage | 230V |
| Weight | 9,020.000 lbs |
| Weight | 9020 lbs |
|---|---|
| Brand | Cantek America |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.