Laguna MPLANPX16-0130 PX|16 Sheartec II Planer 220V 5HP Single Phase

$2,477.40Current price is: $2,477.40.

  • 955.000 lbsWeight
  • MPLANPX16-0130Model
  • PlanersProduct Type
  • 5 HPPower

7 in stock

SKU: LTMPLANPX16-0130 Category: Tags: ,
Description

Overview

Laguna MPLANPX16-0130 PX|16 Sheartec II Planer 220V 5HP Single Phase is documented as a model-specific catalog item from Laguna Tools. The exact MPLANPX16-0130 configuration is mapped to GT Machinery Solutions SKU LTMPLANPX16-0130. Recorded technical data includes weight: 955.000 lbs. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.

Key Features

  • Motor: 220v 5HP 1phase 60hz/23Amp.
  • CSA: Yes
  • Bed Size: 16 x 21-1/2"
  • Pull-Out Extension: 4"
  • Max. Depth of cut: 1/4"
  • Max. Stock Thickness: 8"
  • Min. Stock Thickness: 1/4"
  • Min. Stock Length: 8"
  • Max. Stock Width: 16"
  • Feed Speed: 16 & 28 FPM

Technical Specifications

Weight 955.000 lbs
Additional information
Weight955 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Laguna MPLANPX16-0130 PX|16 Sheartec II Planer 220V 5HP Single Phase”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.