Scotchman AL1-2U 460V Three Phase Electric Tube and Pipe Notcher A030.00009
$7,299.96Current price is: $7,299.96.
- O.D. Pipe Sizes: 3/4", 1", 1-1/4", 1-1/2" and 2"; Schedule 40
- Includes vent notcher to quickly create a uniform vent-notch for galvanizing outflow
- Motor: 3-1/2 hp, 460 Volt, Three Phase
- Manufactured in the Netherlands with a 3-year parts warranty
Scotchman AL1-2U 460V Three Phase Electric Tube and Pipe Notcher A030.00009 is a Scotchman product in the Notchers collection.
Product Details
- O.D. Pipe Sizes: 3/4", 1", 1-1/4", 1-1/2" and 2"; Schedule 40
- Includes vent notcher to quickly create a uniform vent-notch for galvanizing outflow
- Motor: 3-1/2 hp, 460 Volt, Three Phase
- Manufactured in the Netherlands with a 3-year parts warranty
- Description
- Can notch 3/4", 1", 1-1/4", 1-1/2" and 2" up to schedule 40 wall thickness; plus it's equipped with a vent notch to quickly create a uniform vent-notch for galvanizing outflow.
- Features
- Equipped to notch 3/4", 1", 1-1/4", 1-1/2" and 2" up to schedule 40 wall thickness
- Safety guards to surround and protect notching dies
- Electric operation
- Warranty: Three years on parts
- Manufactured in the Netherlands
- Specifications
- Max. Wall Thickness: 0.197" steel 0.118" stainless steel
- 0.197" steel
- 0.118" stainless steel
- Vent Notch: yes
- Profile Applications: Round Tube & Pipe
- Dimensions (L x W x H): 30" x 13-1/2" x 11-1/2"
- Shipping Weight: 230 lbs
Specifications
- Manufacturer: Scotchman
- SKU: A030.00009
- Shipping Method: LTL Freight
- Weight: 230 lb
- Dimensions: 30 × 20 × 15 in
- Country of Origin: Netherlands
- Warranty: 3 Years (Parts)
| Weight | 230.0 lbs |
|---|---|
| Dimensions | 30.0 × 20.0 × 15.0 in |
| Brand | Scotchman |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.