Tin Knocker 230V Three Phase TK Hem & Kick Roll Former

$7,997.50Current price is: $7,997.50.

  • Speed: 90 feet per minute
  • Motor: 5 HP 230V Three Phase
  • Drive: Matched Double Vee Belt
  • Feed table height: 34 5/8”
Description

Tin Knocker 230V Three Phase TK Hem & Kick Roll Former is a Tin Knocker product in the Metal Forming & Shaping collection.

Product Details

  • Speed: 90 feet per minute
  • Motor: 5 HP 230V Three Phase
  • Drive: Matched Double Vee Belt
  • Feed table height: 34 5/8”
  • Description
  • This machine is standard equipped with no tooling in the center position and (2) sets of outboard shafts equipped with;
  • ½” x 180-degree hem rolls for 20-26ga (right side)
  • ½ Hem with 5/8” Kick Rolls (left side)
  • Specifications
  • Motor: 5 HP / 230V / Three Phase / 60Hz / 1800 RPM
  • Base: Arc Welded Steel. Heavy top plate.
  • Dimensions: 68” long, 24” wide, 48” high
  • Shipping Weight: Approximately 1050 lbs.

Specifications

  • Manufacturer: Tin Knocker
  • SKU: TkHemKRF(230V)
  • Shipping Method: LTL Freight
  • Weight: 1,050 lb
  • Dimensions: 69 × 30 × 50 in
  • Warranty: 1 Year (Parts)
Additional information
Weight1050.0 lbs
Dimensions69.0 × 30.0 × 50.0 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Tin Knocker 230V Three Phase TK Hem & Kick Roll Former”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.