Ductformer 5HP 220V Three Phase Standing S Rollformer CR10-SS

$25,155.00Current price is: $25,155.00.

  • Motor: 5HP 220V Three Phase
  • Line Speed: 50 FPM
  • Gauge Capacity: 20-26 Ga
  • 24” Full Hardened Tool Steel Guides
Description

Ductformer 5HP 220V Three Phase Standing S Rollformer CR10-SS is a Ductformer product in the Metal Forming & Shaping collection.

Product Details

  • Motor: 5HP 220V Three Phase
  • Line Speed: 50 FPM
  • Gauge Capacity: 20-26 Ga
  • 24” Full Hardened Tool Steel Guides
  • Description
  • The Ductformer CR10-SS forms the Standing-S profile from pre-cut strips. The Standing-S profile is similar to a standard S-Slip or Flat S section but incorporates a 1 ¼” tall vertical leg that provides additional strength and rigidity to the ductwork. As with all Ductformer rollformers, the quality of the CR10-SS can be observed as soon as the power is turned on. The silence of the machine while running reveals that the precision workmanship and superior design will guarantee years of dependable service.
  • Features
  • All Sealed Roller Bearings
  • Heavy Duty Oil Bath Gear Reducer
  • All Gear Drive
  • High Efficiency Motor
  • Specifications
  • Dimensions: 94”L x 42”W x 46”H
  • Weight: 1,700 lbs
  • Options
  • 5/8” Standing S
  • 1/2” Standing S

Specifications

  • Manufacturer: Ductformer
  • SKU: CR10-SS (220V)
  • Shipping Method: Flatbed
  • Weight: 1,700 lb
  • Dimensions: 94 × 42 × 46 in
  • Country of Origin: United States of America
Additional information
Weight1700.0 lbs
Dimensions94.0 × 42.0 × 46.0 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Ductformer 5HP 220V Three Phase Standing S Rollformer CR10-SS”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.