JLT 12′ Panel Clamp 79F-12-PC

$5,640.00Current price is: $5,640.00.

  • Panel ClampProduct Type
  • 1635 lbsWeight
  • JLT79F-12-PCSKU

6 in stock

SKU: JLT79F-12-PC Category: Tags: ,
Description

Overview

JLT 12' Panel Clamp 79F-12-PC is documented as a Panel Clamp from JLT Clamps. The exact #79F-12-PC configuration is mapped to GT Machinery Solutions SKU JLT79F-12-PC. Recorded technical data includes weight: 1,635.000 lbs. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.

Key Features

  • High Production clamping system for the Medium Size Shop.
  • BEST VALUE – Our Most Popular Panel Clamp Model
  • (5) Total Clamping Levels
  • Includes (30) 3 1/2 High Jaw 40" opening clamps.
  • Produce up to 72+ panels per day.
  • Vertical Clamp Hanging Feature
  • Edge Glue Hundreds of Woodworking Components including:
  • Clamps are Hand Tightened with Heavy Duty "T" Handles

Technical Specifications

Product Type Panel Clamp
Weight 1,635.000 lbs
Additional information
Weight1635 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “JLT 12′ Panel Clamp 79F-12-PC”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.