R.E.S. Corp Hydraulic Alligator Shear 2500LD

$12,917.50Current price is: $12,917.50.

  • Blade Length: 25.25"
  • Round Bar: 2 1/4" Dia.
  • Maximum Cutting Force: 110 Tons
  • Weight: 2500 lbs
SKU: 2500LD Categories: , ,
Description

R.E.S. Corp Hydraulic Alligator Shear 2500LD is a Recycling Equipment Solutions Corp. product in the Shears collection.

Product Details

  • Blade Length: 25.25"
  • Round Bar: 2 1/4" Dia.
  • Maximum Cutting Force: 110 Tons
  • Weight: 2500 lbs
  • Description
  • R.E.S. Shears are 100% made in the United States
  • Lifetime Warranty on the Main Bearing Assembly
  • 10 HP T.E.F.C. U.S. Motor
  • S.A.E. Hydraulic Pump
  • Standard U.S. Style Hydraulic Cylinder
  • Standard JIC Hydraulic Fittings
  • 50 Gallon Oil Reservoir
  • Submerged Oil Pump Means No Dry Starts & a Longer Pump Life
  • 6-Inch-Wide Cutting Deck
  • Adjustable Safety Guard No Tl Required
  • Includes Back Guard to Protect Control Cable & Hydraulic Cylinder
  • Built on Heavy Duty Square Legs
  • 4 Sided Deep Hardened Cutting Blades For Extended Blade Life
  • Specifications
  • Blade Opening Tip To Tip: 14"
  • Motor Size: 10 HP, 220v or 440v / 3ph
  • Jaw Fully Open: 11 Cuts Per Minute
  • Jaw 1 1/2" Open: 63 Cuts Per Minute
  • Dimensions (L x W x H): 72 1/2" x 32 3/4" x 45 1/4"
  • Shear Height: 32 1/8"
  • Foot Pedal Control: Automatic/ Single Stroke
  • Cutting Capacity Mild Steel
  • Angles: 3" x 3/8"
  • Flats: 6" x 3/4"
  • T Section: 3" x 3" x 3/8"
  • I Beams: 4" x 1 3/4" x 5 1b.
  • Square Bar: 1 3/4"
  • Channels: 4" x 2" x 8 1b.
  • Plate: 25" x 1/4"

Specifications

  • Manufacturer: Recycling Equipment Solutions Corp.
  • SKU: 2500LD
  • Shipping Method: LTL Freight
  • Weight: 2,600 lb
  • Country of Origin: United States of America
  • Warranty: 1 Year (Parts)
Additional information
Weight2600.0 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “R.E.S. Corp Hydraulic Alligator Shear 2500LD”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.