Revolution Machine Tools 5.5HP Pipe Spool Master CNC Beveling Machine TGB08
$99,747.50Current price is: $99,747.50.
- Machine Capacity OD: 1”-8”
- Facing Head Diameter: 10”
- Spindle RPMs Max: 100-900 RPM
- X Axis Stroke: 1.57”
Revolution Machine Tools 5.5HP Pipe Spool Master CNC Beveling Machine TGB08 is a Revolution Machine Tools product in the Beveling Machines collection.
Product Details
- Machine Capacity OD: 1”-8”
- Facing Head Diameter: 10”
- Spindle RPMs Max: 100-900 RPM
- X Axis Stroke: 1.57”
- Description
- The Pipe Spool Master TGB 8 CNC has optimum production efficiency, wide range 1″ – 8″ capacity, precise pipe & bolt threading, FANUC CNC, high speed cut groove, beveling, turning and tapering, and custom profiles.
- Specifications
- Main Spindle Drive: 5.5 HP
- Z Axis Stroke: 3.75”
- Weight: 3,850 lbs.
- Machine Dimensions (L x W x H): 61” x 40” x 55”
- Complex Bevels (U, J, & C – Any): Yes – Fanuc CNC Series Oi-TF
- Threading – Cut Groove: Yes – Fanuc CNC Series Oi-TF
- Options
- Follower/Tracer Attachment: If pipe is out of spec – round or oval, attachment will trace pipe to meet customer specifications.
Specifications
- Manufacturer: Revolution Machine Tools
- SKU: TGB08
- Shipping Method: LTL Freight
- Weight: 4,050 lb
- Dimensions: 66 × 45 × 60 in
- Country of Origin: South Korea
- Warranty: 1 Year (Parts)
| Weight | 4050.0 lbs |
|---|---|
| Dimensions | 66.0 × 45.0 × 60.0 in |
| Brand | Revolution Machine Tools |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.