SCM3-Phase 10Hp L’invincibile HSK Tilting 1.25″ Electrospindle Shaper, 5-axis w/FAST table, 7″ touchscreen

$33,450.00Current price is: $33,450.00.

  • 11 HPHorsepower
  • 140mmLength
  • 3Phase
  • Electro SpindleÿShaperProduct Type

9 in stock

SKU: SCMCMTI5 Category: Tags: ,
Description

Overview

SCM3-Phase 10Hp L'invincibile HSK Tilting 1.25″ Electrospindle Shaper, 5-axis w/FAST table, 7″ touchscreen is documented as a Electro SpindleÿShaper from SCM Group North America Inc. The exact TI5 configuration is mapped to GT Machinery Solutions SKU SCMCMTI5. Recorded technical data includes horsepower: 11 HP, phase: 3, and range of speeds: 900 – 12000 RPM. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.

Technical Specifications

Horsepower 11 HP
Length 140mm
Phase 3
Product Type Electro SpindleÿShaper
Range of Speeds 900 – 12000 RPM
Weight 2,200.000 lbs
Additional information
Weight2200 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “SCM3-Phase 10Hp L’invincibile HSK Tilting 1.25″ Electrospindle Shaper, 5-axis w/FAST table, 7″ touchscreen”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.