Cantek SR37 37″ x 75″ Two Head Wide Belt Sander 3PH 20HP/15HP
$31,070.00Current price is: $31,070.00.
- 37" x 75"Belt Size
- 3PHDrive Motor
- 4002 CFMDust Collection Minimum CFM Required (CFM)
- 6 @ 5"Dust Port Outside Diameter (In.)
7 in stock
Overview
Cantek SR37 37" x 75" Two Head Wide Belt Sander 3PH 20HP/15HP is documented as a Wide Belt Sander from Cantek America. The exact CANSR37DA-SR-3 configuration is mapped to GT Machinery Solutions SKU CANSR37DA-SR-3. Recorded technical data includes horsepower: 20HP/15HP, feed motor power (hp): 3HP, and motor power (hp): 20HP/15HP. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.
Technical Specifications
| Belt Size | 37" x 75" |
|---|---|
| Drive Motor | 3PH |
| Dust Collection Minimum CFM Required (CFM) | 4002 CFM |
| Dust Port Outside Diameter (In.) | 6 @ 5" |
| Feed Motor Power (HP) | 3HP |
| Feed Rate (FPM) | 13 to 59 FPM |
| Horsepower | 20HP/15HP |
| Motor Current (Amps) | 102 |
| Motor Phase | 3 |
| Motor Power (HP) | 20HP/15HP |
| Motor Voltage (V.) | 230 |
| Phase | 3 |
| Product Type | Wide Belt Sander |
| Sanding Belt Size (In.) | 37" x 75" |
| Style (Type) | Wide Belt |
| Voltage | 230V |
| Weight | 2,882.000 lbs |
| Weight | 2882 lbs |
|---|---|
| Brand | Cantek America |
Clear handling and delivery estimates for every order.
Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.
-
01
Order review
After checkout, we confirm product availability, destination type, site access and required carrier service before release.
-
02
Handling and dispatch
In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.
-
03
Estimated transit
Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.
-
04
Inspect on delivery
Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.
Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.











Reviews
There are no reviews yet.