RAMS 20ga Pittsburgh Machine RAMS-2006

$3,197.50Current price is: $3,197.50.

  • Capacity: 20 GA. MAX. Mild Steel
  • Capacity: 26 GA. MIN. Mild Steel
  • Approx. Speed: 25 FPM
  • 1 HP electric motor, 110-115V single phase
Description

RAMS 20ga Pittsburgh Machine RAMS-2006 is a Rams Sheet Metal Equipment product in the Metal Forming & Shaping collection.

Product Details

  • Capacity: 20 GA. MAX. Mild Steel
  • Capacity: 26 GA. MIN. Mild Steel
  • Approx. Speed: 25 FPM
  • 1 HP electric motor, 110-115V single phase
  • Description
  • This unit comes with a 1 HP electric motor, 110-115V single phase. RAMS uses Torrington Needle Bearings and hardened steel components throughout. The cabinet is heavy gauge steel with a Hammertone Green Finish.
  • Specifications
  • Capacity: 20 GA. MAX. – 26 GA. MIN. Mild Steel
  • Motor: 1 HP electric motor, 110-115V single phase
  • Dimensions: 36" L x 17.5" W x 34" H
  • Approx. Weight: 350 LBS

Specifications

  • Manufacturer: Rams Sheet Metal Equipment
  • SKU: RAMS-2006
  • Weight: 360 lb
  • Dimensions: 42 × 30 × 50 in
Additional information
Weight360.0 lbs
Dimensions42.0 × 30.0 × 50.0 in
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “RAMS 20ga Pittsburgh Machine RAMS-2006”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.