Cantek M412 4 Sided Planer/Molder Three Phase

$14,640.00Current price is: $14,640.00.

  • 1216mmHeight
  • 1485mmLength
  • 3Phase
  • 230VPower

5 in stock

SKU: CANM412 Category: Tags: ,
Description

Overview

Cantek M412 4 Sided Planer/Molder Three Phase is documented as a Planer Moulder from Cantek America. The exact CANM412-230-3 configuration is mapped to GT Machinery Solutions SKU CANM412. Recorded technical data includes phase: 3, width: 1265mm, and height: 1216mm. Use the specification table and linked product literature to confirm electrical, capacity, dimensional, and installation requirements for project planning.

Key Features

  • Allows for 4 cutting modes: single two, three and 4-side planing and moulding.
  • Individual powerful motor drive for each spindle.
  • High quality disco type variable feed speed unit.
  • Automatic machine stop when top guard is opened.
  • In feed & outfeed table extensions (optional) for firm support of large word.
  • Equipped with 3 depth of cut control plates for bottom cutterhead.
  • Sea-thru top guard for viewing cutterheads.
  • Comes with straight knives for top / bottom heads
  • Does not include side heads
  • Each cutterhead is individually controlled on the control panel

Technical Specifications

Height 1216mm
Length 1485mm
Phase 3
Power 230V
Product Type Planer Moulder
Weight 1,610.000 lbs
Width 1265mm
Additional information
Weight1610 lbs
Brand
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Cantek M412 4 Sided Planer/Molder Three Phase”

Your email address will not be published. Required fields are marked *

Shipping & Delivery
Shipping timeline & delivery

Clear handling and delivery estimates for every order.

Standard delivery is included to eligible commercial addresses in the contiguous United States and District of Columbia. We review the destination and receiving requirements before release, then confirm the applicable handling and transit schedule.

  1. 01
    Order review

    After checkout, we confirm product availability, destination type, site access and required carrier service before release.

  2. 02
    Handling and dispatch

    In-stock, ready-to-ship ground products generally leave within 1 business day. Manufacturer-prepared, configured or special-order machines may require additional lead time.

  3. 03
    Estimated transit

    Ground orders commonly arrive 5–7 business days after shipment. Equipment over 100 lb normally travels by LTL in about 7–10 business days after shipment.

  4. 04
    Inspect on delivery

    Check every piece before signing. Record visible damage or shortages on the delivery receipt, take photos and contact us promptly.

Delivery times are estimates, not guarantees. Manufacturer lead time, product preparation, configured or special-order equipment, weather, carrier capacity, remote destinations and appointment scheduling may add time. GT Machinery Solutions will communicate a material delay and the best available revised estimate.